Transformer and Reactor Assembly

Comprehensive ‘start to finish’ assembly completed in
compliance and with ensured quality, including but not limited to
the installation of fans, radiators, piping, rails, turrets, bushings,
and conservators.

Transformer and Reactor Assembly

TRANSFORMER LANDING
Overseeing the positioning and installation of the main tank and vibration pads to meet approved engineered drawings prior to assembly.

T R A N S F O R M E R A S S E M B LY
Assembly of transformers to the manufacturer’s drawings and procedures using our experienced supervisors, qualified tradesmen, and trained technicians with remote support from our company director, general manager, project manager, project administrator, and business administrator.

C O O L I N G T O W E R  A S S E M B LY
For units with separate cooling towers, our team ensures accurate surveying before commencement, correct tower anchoring, achieved alignment to main tank and assembly of cooling tower to manufacturer's drawing and procedures.

C O N S E R VAT O R  T E S T I N G
Testing of conservator diaphragm and devices is performed to procedure, with any discrepancies rectified prior to installation, with the expertise and safe working procedure to replace diaphragms if needed.

​​PROJ ECT CLOSE OUT
Project close out is valued and prioritised at Konic Group to ensure all minor tasks such as touch up painting, site clean up, waste and oil disposal, torque checks, equipment maintenance, plant servicing and bump out are completed to a high standard.

VISIT

46 York Street,

Wingfield 
South Australia, 5013

About
 

  • ABN 27 600 858 777

  • ACN 600 858 777

  • Quality ISO 9001

  • Enviro ISO 14001

  • Safety ISO 45001

  • SA Electrical Contractors Licence PGE270705

  • VIC Electrical Contractors Licence E10-16540 / REC-33212 (EnergySafe Vic)

  • NSW Electrical Contractors Licence 367825C

  • QLD Electrical Contractors Licence 1505022

bottom of page